Over 200 projects, 15+ government works, 150+ residential and commercial projects, and source approval from the independent engineers and authorities who sign off the structures.
An Adani Enterprises subsidiary. The coal-to-PVC plant stands at Village Vandh, Taluka Mundra, Kutch, Gujarat, inside SEZ premises. Purchase Order 4500380680 for supply of threaded regular and reducer couplers, plus Service Order 5700358500 for on-site cutting, cold forging and threading.
Multipurpose dam on the Godavari river designed to generate hydroelectric power, East Godavari.
Approximately 148 km suburban rail network, executed with NCC.
Important bridge on new alignment between Pardi and Atul, Valsad region, for the 160 km/h speed upgrade of the Virar-Surat section, Mumbai Division. Source approved by the Dy. Chief Engineer (Bridge Line), Dadar.
Four NHAI and three AUDA bridge projects, including the Sarkhej-Changodar elevated corridor of NH-8A (new NH-47) and the Narol-Sarkhej six-lane upgrade.
Metro rail works for Gujarat Metro Rail Corporation Limited, including the Surat Metro.
Webuild-Apco JV for MSRDC. Vendor credential and product approval reviewed by Louis Berger S.A.S. as Authority Engineer.
Refurbishment of the existing bridge and construction of new bridges across the Sabarmati, EPC with Dineshchandra R. Agrawal Infracon. Final approval accorded by AECOM India as General Consultant for Ahmedabad Municipal Corporation.
BTG package for 2 × 800 MW, L&T Energy CarbonLite Solutions. Supply and installation of 25 mm and 32 mm couplers.
Majirgaon Palasbari to Sualkuchi Bridge, Larsen & Toubro Construction, Kamrup Metropolitan.
Upgradation of the existing six-lane road including elevated corridors, km 0/00 to 10/170. Source approved by the Independent Engineer for H.G. Narol Sarkhej Highway Private Limited.
Himalayan rail link project.
Packages 03 and 05 approved.
Airport works approval.
Joint venture of NHPC Ltd. and JKSPDC Ltd.
Port infrastructure works.
MoRTH national highway works.
NHAI approval through SP Singla Constructions.
Chainage km 146+700 on the Mehsana-Himmatnagar road (SH-55), for State Road Project Division, Mehsana, with Ananta Procon.
Four-laning from Varunapuri to Sada junction and elevated road to MPT Gate No. 9, EPC mode.
Institutional and healthcare buildings.
Medical college and hospital projects.
Approval from Nippon Koei PMC for Kalthia Engineering & Construction Ltd.
Housing board works approval.
Approved vendor for Adani Realty, Adani Power Ltd. and Adani Infra and Developers Pvt. Ltd.

































Logos are the property of their respective owners and are shown to indicate projects supplied and source approvals granted. Approval letters and performance certificates are available on request.
Performance certification issued on 29 April 2026. It confirms our on-site cutting, cold forging and threading of reinforcement bars for coupler installation on the Green PVC project, Mundra.
Performance certificate dated 20 April 2026 for the six-lane Sabarmati bridge at Vijapur. The client recorded satisfactory performance, good workmanship, proper planning and effective use of resources.
Performance testimonial dated 23 November 2025 for Western Railway Bridge No. 313, The client also sent a letter of appreciation for the Sarkhej-Changodar NH-8A extradosed bridge.