Put your own rates and your own bar schedule in, and the sheet prices both methods line by line. We show every formula in full, with your numbers put in. All values in Indian Rupees.
Enter your steel rate, your lap length and the number of connections per bar diameter. We pre-fill our standard coupler and threading rates as a reference. Overwrite them with your own negotiated rates at any time. Every formula is fixed, and we show it in full under Show the full calculation. Nothing you type leaves your browser.
Six numbers set the whole comparison. The defaults are our own site observations. Replace them with your measured figures.
Shift wage ÷ shift length. This is the figure used in the costing.
Enter the number of laps you would otherwise have used at each diameter. Leave a diameter at 0 if it is not on your project.
| Bar dia (mm) |
Connections (nos.) |
A. Lap splice method | B. Coupler method | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Lap length (m) |
Extra steel (kg) |
Steel cost (₹) |
Tying labour (₹) |
Coupler rate (₹/piece) |
Threading rate (₹/piece, both ends) |
Material + threading (₹) |
Assembly labour (₹) |
||
| TOTAL | 0 | n/a | 0 | 0 | 0 | n/a | n/a | 0 | 0 |
IS 1786 fixes the standard weight of bar per metre, and the sheet applies it automatically. Coupler and threading rates shown are indicative ex-works rates, subject to formal quotation.
Enter the number of connections above to see your project's figures.
Eight things a coupler gives you that the rate sheet never shows. None of them is priced anywhere above.
Steel that is never rolled is carbon that is never emitted. This is simply the reinforcement steel saved, multiplied by the embodied carbon factor you entered in Step 1. It is your own project's number, not an industry average quoted at you. It is the figure to put in a tender response that asks for carbon reduction measures.
A lap passes load from bar to bar through the concrete around it, so grade, cover, compaction and workmanship all affect it. A coupler passes load straight from bar to bar.
At a lap, two bars run side by side and double the steel in that zone. A coupler sits on one bar line, so the concrete can flow and compact.
Codes limit how much steel you may lap at one section. Couplers carry no such limit, so you splice where the construction joint falls.
Nobody can inspect a lap once it is concreted. A coupler has a batch, a test certificate to IS 16172:2023 and a visible installed condition.
Lapping gets slower and heavier as bars get larger. A coupler takes about the same time at every diameter, so the programme stays predictable.
Starter bars, precast connections, staged construction, dowelling into existing structures and retrofit. Here a coupler is not the cheaper option. It is the only option.
Take the lap allowance out of every bar and stock lengths cut with less offcut. Shorter bars are also easier to transport, crane and place.
Our crews cut, forge and thread bar ends at your site. You do not wait on cut-and-bend turnaround, and a drawing revision does not need a re-order.
The comparison above deliberately prices only the steel, the coupler, the threading and the labour. This calculator puts no rupee value on any of the eight points, so the saving it shows is a conservative one. Where a project is programme-driven, congested, or carries a carbon commitment, the real benefit is larger than the number this sheet produces.
These figures are an indicative cost comparison. This is not a design tool and it does not replace your structural engineer.
Check any figure from this sheet against the drawings, the bar bending schedule and a formal quotation before you rely on it. VUK Industries Private Limited accepts no liability for a decision taken on these figures.
Send us the bar diameters, the quantities and the site location. You get a technical offer, a sample Material Test Certificate and a lead time, usually on the same working day.